During the summers of 2011 and 2012, Fugro West, Inc. conducted an extensive P-Cable program as part of an overall seismic assessment of the Diablo Canyon Nuclear Power Plant.  The entire report is available for download here.

 

The chapter focused on the P-Cable study can be found at the following links: 

Text (2 Mb)

Figures (41 Mb)

Plates (4.7 Mb)

Appendix – Supplementary Figures (13.5 Mb)